Friday, October 8, 2010

Drywall!















The ductwork for the exhaust is being installed using exposed spiral duct.















The smaller duct can be installed from ladders but the larger 22" diameter sections will need to be done from a scissor lift.



















One of the kennel rooms with the drywall hung.



















The large dog kennel room with drywall complete.
















The entry wall with the sound board hung.

Thursday, October 7, 2010

ROUGH MEP AND FRAMING SIGN OFF!

Yesterday we had our first round of inspections for mechanical, electrical and plumbing. We had only minor corrections and had everything corrected that day. Framing inspection was this AM and we are cleared to close up the walls.















The Brick wall infill in progress.















The view as you enter. The full height sound wall is insulated and the sound board is onsite ready to go. The metal brackets are support for the cantilevered wood shelves.















Another view of the entry wall.















The ductwork being installed for the ventilation system which will provide over 12 air changes per hour.

Monday, September 27, 2010















Mechanical ducting going in for the entry and office areas.

Week 4: Day 1

Most of the rough framing, electrical, plumbing and mechanical is in and ready for inspection.















Standing in the dog run looking into the grooming room















Looking towards the dog kennel rooms



















The HVAC ductwork being installed.















The rough plumbing for the grooming room and the bathroom on the other side.



















The trench drain running the length of the of the dog run for easier and better cleaning.

Monday, September 20, 2010

Week 3: Day 1

Fitdog Sports Club is a 5000sf indoor full service doggie day care and boarding center located In Santa Monica. They provide daycare, boarding, grooming, training and sports activites. Check out the facility details at http://www.fitdogsportsclub.com/

Synthesis designed and won the bid for construction of the facility.
















A view of the back of the space before demolition. This is where the dog run area will be.



















This is what the space looked like before we started Demo. Most of the walls and ceilings were removed by the previous tenant. The existing bathrooms and front room were left.















After demolition, all that was left were a few walls that are being reused for the new break room, office, bathroom & grooming rooms.



















The pile of concrete from all the trenching to cap the existing plumbing and install the new plumbing.















The new walls being framed up for the large ans small dog kennel and sleeping rooms.















The new framing looking from the dog run area.















The small dog open sleeping room and trenching for the floor drain.

Wednesday, September 15, 2010

Construction has begun

We have completed demolition and are currently doing rough framing, rough electrical and rough plumbing. Construction photos will be posted tomorrow.