Monday, September 27, 2010

Week 4: Day 1

Most of the rough framing, electrical, plumbing and mechanical is in and ready for inspection.















Standing in the dog run looking into the grooming room















Looking towards the dog kennel rooms



















The HVAC ductwork being installed.















The rough plumbing for the grooming room and the bathroom on the other side.



















The trench drain running the length of the of the dog run for easier and better cleaning.

No comments:

Post a Comment