Mechanical ducting going in for the entry and office areas.
Monday, September 27, 2010
Week 4: Day 1
Most of the rough framing, electrical, plumbing and mechanical is in and ready for inspection.

Standing in the dog run looking into the grooming room

Looking towards the dog kennel rooms

The HVAC ductwork being installed.

The rough plumbing for the grooming room and the bathroom on the other side.

The trench drain running the length of the of the dog run for easier and better cleaning.
Standing in the dog run looking into the grooming room
Looking towards the dog kennel rooms
The HVAC ductwork being installed.
The rough plumbing for the grooming room and the bathroom on the other side.
The trench drain running the length of the of the dog run for easier and better cleaning.
Monday, September 20, 2010
Week 3: Day 1
Fitdog Sports Club is a 5000sf indoor full service doggie day care and boarding center located In Santa Monica. They provide daycare, boarding, grooming, training and sports activites. Check out the facility details at http://www.fitdogsportsclub.com/
Synthesis designed and won the bid for construction of the facility.

A view of the back of the space before demolition. This is where the dog run area will be.

This is what the space looked like before we started Demo. Most of the walls and ceilings were removed by the previous tenant. The existing bathrooms and front room were left.

After demolition, all that was left were a few walls that are being reused for the new break room, office, bathroom & grooming rooms.

The pile of concrete from all the trenching to cap the existing plumbing and install the new plumbing.

The new walls being framed up for the large ans small dog kennel and sleeping rooms.

The new framing looking from the dog run area.

The small dog open sleeping room and trenching for the floor drain.
Synthesis designed and won the bid for construction of the facility.
A view of the back of the space before demolition. This is where the dog run area will be.
This is what the space looked like before we started Demo. Most of the walls and ceilings were removed by the previous tenant. The existing bathrooms and front room were left.
After demolition, all that was left were a few walls that are being reused for the new break room, office, bathroom & grooming rooms.
The pile of concrete from all the trenching to cap the existing plumbing and install the new plumbing.
The new walls being framed up for the large ans small dog kennel and sleeping rooms.
The new framing looking from the dog run area.
The small dog open sleeping room and trenching for the floor drain.
Wednesday, September 15, 2010
Construction has begun
We have completed demolition and are currently doing rough framing, rough electrical and rough plumbing. Construction photos will be posted tomorrow.